Construction process

From demolition to handover: how an Immovelopment construction project works – using a detached house as an example, in twelve steps.

01 · Existing building

The starting point

An ageing detached house on a well-located plot – more potential than substance.

02 · Demolition

Demolition of the old building

Stripping out, proper separation of materials and demolition. Within a few days the plot is clear.

03 · Excavation

Excavation and pit

The pit is excavated and secured; sewer and utility connections are prepared.

04 · Base slab

Reinforcement and base slab

Blinding layer, waterproofing and reinforcement – then the base slab is cast in one pour.

05 · Basement

Formwork and concreting of the basement

The basement walls are shuttered and cast as a watertight concrete structure.

06 · Shell

Storeys and roof truss

Masonry and ceilings rise storey by storey; the carpenter erects the roof truss.

07 · Roof

Roofing

Battens, underlay and tiles – the house gets its roof.

08 · Windows

Wind- and watertight

With the windows and doors installed, the shell is closed – the interior fit-out can begin.

09 · Building services

Heating, electrics and plumbing

Underfloor heating, cabling and service cavities are installed before screed and drywall follow.

10 · Interior fit-out

Screed, walls and surfaces

Fireplace, screed, wall surfaces and ceilings: step by step the rooms take shape.

11 · Finishing

Floors, lighting and kitchen

Lighting, floors and the fitted kitchen are installed – the house becomes a home.

12 · Completion

Outdoor areas and handover

Terraces, paths and garden are laid out. After the final inspection, the keys are handed over.